JCMUA Aqueduct Loop Phases 2-5

JCMUA Aqueduct Loop Phases 2-5

JCMUA Aqueduct Loop Phases 2-5 Client: : JERSEY CITY MUNICIPAL UTILITIES AUTHORITY (JCMUA) The goal of this project is to continue the installation of an aqueduct main (30” Water Main Pipe) along the southeastern portion of the City to continue the process of...
Asbury Park Citywide Wayfinding Project, Asbury Park, NJ

Asbury Park Citywide Wayfinding Project, Asbury Park, NJ

Asbury Park Citywide Wayfinding Project, Asbury Park, NJ Client: CITY OF ASBURY PARK The City of Asbury Park hired ENGenuity Infrastructure for the design, planning, permitting, and construction management for proposed wayfinding signage throughout the entire city....
Water Rate Study, Red Bank, NJ

Water Rate Study, Red Bank, NJ

Water Rate Study, Red Bank, NJ Client: BOROUGH OF RED BANK The Borough of Red Bank owns and operates its own water and sewer utility which comprises of two water treatment plants and a water distribution system as well as a wastewater collection system. The Borough...
Park Avenue Water Main Replacement, Hoboken, NJ

Park Avenue Water Main Replacement, Hoboken, NJ

Park Avenue Water Main Replacement, Hoboken, NJ Client: CITY OF HOBOKEN The City of Hoboken hired ENGenuity Infrastructure and another engineering consultant for the design, environmental planning, and permitting for watermain replacement along Park Avenue. ENGenuity...