Education & Institution Projects

D

back to projects

New Providence BOW Miller Field Improvements

NJ DOE STATE PROJECT #3560-050-18-2000

Client: NEW PROVIDENCE BOARD OF EDUCATION

ENGenuity handled Site Civil Design, Shop Drawing review, and Construction Inspection for Site Civil aspects of a school renovation. The project included the design of a sod infield, roofing and reconfiguring two (2) dugouts, replacement of silver fencing mesh with six (6) gauge black galvanized steel mesh, repair/replacement of the existing PA system, installation of dual bull pens, an extension of the irrigation system into the infield, and the installation of a storage shed at Miller Field, New Providence Middle School and High School. ENGenuity was responsible for plans and grading for sodding the infield, layout and design of the bullpens, replacement of fencing, a performance specification for irrigation, and grading, and design of a proposed walkway to the new shed. The overall construction budget was $5.8 million.